For Varese Hospital, we provided project and design management for the mechanical systems, working for Cofely GDF Suez. The development covers approximately 70,000 m².
The assignment was led by Ing. Danilo Franchi and brought together two responsibilities: coordinating the mechanical design and managing the testing of the installed systems.
Hospitals are among the most demanding buildings for mechanical engineering. Heating, ventilation and air-conditioning serve wards, clinical areas and technical spaces, each with its own needs, and they are expected to run reliably around the clock.
Coordination keeps the many parts of such a design consistent with one another, and testing confirms that what was designed is what actually operates in the building. Placing both under one management role gave the project a continuous line of responsibility from design through to verification.